METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-99 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
be served by one conduit run. All conduits shall be GRS, minimum one inch
(1"). Conduits shall be routed directly from the junction boxes to the TC & C
room. The conduits shall not pass through a Communications Interface Cabinet
(CIC). No other circuits may be shared in a CCTV conduit.
I. Fire and Emergency Management Conduits
Fire and Emergency Management Conduits shall be embedded GRS conduit for
various types of detectors, sound powered telephones and emergency
annunciation cabinets/panels.
1. Embedded or concealed GRS conduits shall be provided from all Fire,
Smoke, and Heat detector junction boxes to the appropriate CIC or to the TC
& C room. Conduits shall be a minimum of one inch (1"). No other types of
circuits may be shared in a fire/smoke/heat detector conduit.
2. Junction boxes for detectors shall be embedded and located nine feet above
finished floor in a wall. (The Systems Contractor will extend the circuit via
surface mounted conduit to the ultimate detector location).
3. The Emergency Management Panel (EMP) shall be provided with four (4)
three inch (3") conduit and two (2) one inch (1") which shall run directly from
the EMP to the TC & C room.
4. The Command Post (CP) (Subway System only) shall be provided with two
(2) two inch (2") conduits which shall run directly from the CP to the TC & C
room.
9.5.3 Tunnel Conduit/Tray Routing
Subsystem Devices of the same system within tunnel area shall be grouped and
routed to an Area-Junction Box. From this Area-Junction Box, all wires of that
subsystem will share an adequately sized common conduit or tray, for wire
routing to the designated Communications Interface Cabinet (CIC).
1. Conduit or tray routing of Subsystem Devices shall be configured as to
reduce the quantities of single conduits or tray runs from devices to a
Communications Interface Cabinet (CIC) or to the station or tunnel area TC
& C room.
2. Subsystem Devices located in close proximity to the station or tunnel TC & C
room may be grouped and routed directly into the TC & C room. If these
conduits enter the TC & C room from overhead, they shall be located 11'-6"
above the finished floor or 6" above the room cable tray.
3. Conduit or tray routing shall be configured to provide the routing path with
the fewest changes of direction.