METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-117 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
PTZ cameras by their natures are adjustable and these calculations should be
considered for a “home” or “cage” position.
Cameras that provide overviews of interior and exterior locations should have
their focal lengths selected so as to meet the field-of-view requirements of the
facility. However, exit cameras should have sufficient depth-of-field of at least
three to four feet for walking pace objects to ensure that subjects exiting the
facility will be in focus.
Field of view (FOV) relates to the size of the area that a camera will see at a
specific distance from the camera. The field of view is dependent on lens focal
length and camera format size. The FOV width and height can be calculated
using the following formulas: FOV Width = Format (horizontal in mm) X Distance
(in Feet from camera) Focal Length FOV Height = 0.75 X FOV width
Manipulating the FOV formula allows a calculation of the distance in feet from
the camera for a required FOV width. The formula becomes: Distance (in feet
from camera) = FOV width X Focal Length Format (horizontal in mm)
C. Camera Mounts
Manual adjustable mounts shall be provided for each camera. Positive position
locking shall be provided. Cameras shall be located unobtrusively and at as high
an elevation as possible to maximize field of view and reduce vandal access, but
low enough to access using an eight foot ladder. If cameras are located higher
than this, fall protection must be installed per OSHA guidelines.
D. Camera Identification
A discrete camera ID consisting of a minimum of sixteen alphanumeric digits in
ASCII-II code shall be superimposed on each camera video to identify the
camera location including the platform (east/south or west/north bound) location.
E. Wayside Transmission
Video transmission between each passenger station and the ROC monitoring
areas shall be by digital fiber optic techniques. Each passenger station and
TC&C room shall be serviced with sufficient supporting equipment capacity to
add 40% additional cameras for expansion. (Example: Nine cameras plus 40%
equals 13 cameras total.)
The fiber optic network for the CCTV system shall provide equipment at each
station/location for multiple CCTV camera inputs. The optically transmitted signal
shall be recreated at the ROC for distribution to the various monitors.
F. Video Recording System
All CCTV camera signals shall record video images in real time at the ROC.
Camera signals shall be routed into a recording unit permitting all cameras
to be simultaneously recorded. The playback provision shall be able to
display recorded images.