METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
Appendix A
DE304.09 Appendix 9A-1
Metro Baseline Re-Baseline: 04/20/10
REMOTE TERMINAL UNIT
PART 1 - GENERAL
1.1 BACKGROUND
Los Angeles County Metropolitan Transportation Authority (Metro) remotely supervises and
controls train operations and rail facilities from its Central Control Facility (CCF) with heavy
reliance on Supervisory Control and Data Acquisition (SCADA) systems from various vendors.
The SCADA systems interface with Remote Terminal Unit (RTU) equipment installed at wayside
communications locations to provide interfaces to various subsystems including Train Control,
Traction Power and station facilities.
The scope of work and specifications herein are specifically for the SCADA Remote Terminal
Unit only.
1.2 SCOPE OF WORK SUMMARY
A OVERVIEW
This contract will supply SCADA RTU assemblies in various configurations for
installation in locations including but not limited to wayside equipment cases,
communications rooms and traction power substations.
Actual assemblies to be supplied shall be based on a standard configuration with site
specific main and remote I/O.
The Contractor shall assemble, factory test, package, store, ship, install and field test all
assemblies.
B BASIS OF DESIGN
The standard RTU design described in these technical provisions shall be reliable and
maintainable. The selected technologies shall be based on the latest stable product
offerings and have verified vendor support for at least 20 years.
PART 2 - SCOPE OF WORK
2.1 SCOPE OF WORK SUMMARY
A The work to be performed by the Contractor shall include procurement,
assembly, configuration, documentation, storage, factory testing, delivery,
installation, local field acceptance testing and maintenance training for Remote
Terminal Units in accordance with the specifications herein. The Scope of Work
shall include all components, subassemblies, equipment, materials, cable, cable
management, hardware, software, configuration and appurtenances necessary to
provide a complete operational Remote Terminal Unit as described in these
Specifications. The Contractor shall furnish the system equipment, software and
Seitenansicht 161