METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-12 Revision 4: 05/09/12
Metro Baseline Re-Baseline: 04/29/10
surface shall be as level as possible to minimize the gap between equipment
bases and finish surface of pad.
TVMs and SAVs will be installed level by fare collection equipment
personnel. Fare gate consoles will be installed level side to side and parallel
front to back by fare collection equipment personnel. Any resulting gap
between TVM, fare gate, orSAV base and the finish mounting surface will be
sealed.
2. Conduits
For Communications, minimum branch conduit sizes to be run from each
device location to nearest communication pull box or junction box located
within area of TVM/SAV Group shall be 1” for Telephones, 1” for CCTV
cameras, 1” for separate PA zone, two (2) 1” for message boards, 2” for
TVMs, 1” for SAVs, 1” for fare gate underfloor duct junction boxes, with
minimum 2” size home conduit run for each subsystem continuing to the
Communication room or the cabinet for installation of communications and
SCADA interface cables.
For Power, minimum 1” size branch conduit shall be run from each message
board, TVM/SAV location and from each fare gate underfloor duct junction
box to nearest power pull box, with continuation conduit of appropriate size
(per NEC) for wiring requirements running to the station power panel for
installation of power wiring.
Conduits should have all sharp edges removed.
Communications conduit shall be installed between the location of station
network equipment and the location of each TVM, fare gate underfloor duct
junction box, and SAV. Communication pull boxes shall also be
appropriately located for length of main conduit run(s). Conduit arrangement
should use main run to each general location of equipment with branch runs
continuing between junction box and each TVM/SAV location and to each
fare gate underfloor duct junction box. Conduit arrangement shall allow for
node-type (node at communication room or cabinet) communications cable
connections (between TVMs, fare gates, and SAVs, and the UFS station
network equipment at communication room or cabinet) through the use of
appropriately located communication pull boxesand/or junction boxes.
Conduit arrangement shall support installation of both copper and fiber optic
cable runs between station network equipment connected to node at
communication room or cabinet and TVM with hub, and between TVM with
hub to each additional TVM and SAV or fare gate within the TVM and SAV
or Fare Gate Group, along with copper SCADA Interface Cable (SIC) from
MDF at communication room or cabinet to each TVM Group(station platform
entrance), with SIC cable connected to additional TVMs within same Group
in daisy chain manner.
Dedicated, minimum 2” size conduit shall be provided from a telephone
utility box/pole to the enclosure for communications to bring in and terminate
telephone company cable or other communications lines as appropriate.