METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
Appendix A
DE304.09 Appendix 9A-19
Metro Baseline Re-Baseline: 04/20/10
(ii) Detailed description of each custom algorithm or program segment
(for example, input and output buffering, output pulse duration, PLC
execution status, power up and fault routines)
d. Fully commented Source code
D Training Documentation
1. Contractor supplied training documentation shall include components for
instructor and students.
2. The level of instruction and detail in the documentation shall be sufficient to
develop staff capable of operating and maintaining the RTU subsystem
without the need for Contractor or vendor reliance.
3. The following training documentation shall be provided, each as a separate
bound package:
a. Instructor Guide – The instructor guide shall provide a road map for
instructors and shall follow industry best practices for technical
instruction including but not limited to complete lesson plans and test
materials.
b. Student Guide – Student guide shall contain summary lesson plans
and appropriate reference material for effective classroom instruction.
E Factory Test Plan and Procedures
Test plans and procedures shall be prepared in accordance with industry best practices
and include but not be limited to:
1. Identification of test items.
2. System risk issues.
3. Features to be tested.
4. Features not to be tested.
5. Approach: roles and responsibilities, testing levels, configuration
management/change control, and test tools, schedule requirements,
planning risks and contingencies, and approvals.
6. Specific test procedures detailing test objectives, setup/tear-down, test
steps, item pass/fail criteria, and test record documentation requirements.
7. Discrepancy reporting and corrective action.
8. Suspension and resumption criteria.
9. Test deliverables.
PART 6 - EXECUTION