METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-14 Revision 4: 05/09/12
Metro Baseline Re-Baseline: 04/29/10
3. Connections to Fare Collection Equipment
Connections from the power panel and the station communications room or
the cabinet at locations of TVMs and SAVs shall utilize one of two options
below, Connections from same at locations of fare gate consoles shall utilize
underfloor duct only.
a. Conduit Stub-ups
If conduit stub-ups are used (as opposed to underfloor duct), conduit stub up
for power (1" Branch Conduit) and communications (2” Branch Conduit for
TVM; 1” Branch Conduit for SAV) shall be installed in the center of each
TVM/SAV footprint. Conduit stub-ups at TVM and SAV locations should be
sealable with removable threaded metal plug inside metal female conduit
coupling that is flush with the finish surface. Conduits stubbed into the SAV
footprints shall be orientated to fit within the 4” x 6” base opening of the SAV
(6” side parallel with the 14” width of the SAV) centered within the SAV
footprint. These requirements shall also apply to spare TVM/SAV locations
(locations with provisions to install additional machines in future).
b. Underfloor (Under platform) Raceway System
An underfloor raceway system shall have separate power and
communication conduits (ducts) going to each TVM, SAV or fare gate
console. Raceways shall be embedded in the floor to support all initial TVM
SAV and fare gate console locations, as well as allowance for future
additions of TVMs, SAVs, and fare gate consoles. Cover on underfloor duct
and conductor fill shall be implemented per NEC requirements,
One end junction box shall be positioned directly above the pullbox in the
slab to facilitate pulling both power and communication cables from the pull
box in the structural slab into the underfloor raceway system for later
connection to the fare collection equipment above.
Underfloor duct risers (aftersets) at TVM, SAV, or fare gate console
locations shall be installed in the center of each TVM,SAV,or fare gate
footprint, one from the communications duct and one from the power duct.
Each riser shall be sealable with removable threaded metal plug that is flush
with the finish surface.
For conductors run on common conduit or raceway, two additional
guidelines shall apply. The voltage insulation rating of all conductors shall
match the highest insulation rating. Wires for conductors in common
raceway shall be shielded type wires.
4. Electrical
Power conduit shall be installed to run power circuits from the station power
panel to each TVM, SAV, and fare gate console location, and to the station
communications facility. Conduit shall utilize intermediate power pull boxes