METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-17 Revision 4: 05/09/12
Metro Baseline Re-Baseline: 04/29/10
Machine availability percentage (minimum 95%)
Mean transaction time by form of payment or transaction (for
example, average transaction time needed to purchase a 20-trip ticket
from a TVM if using two $10 bills.)
Distribution of payment / transaction types (percentage sold by the
TVM that is expected to be paid by each combination of coins and
bills.)
Inputs for individual station:
Daily ridership
AM peak ridership
PM peak ridership
Ridership surge percentage (the percent by which sudden surges
exceed the “constant arrival rate”, for example as would be caused by
a train arriving at the North Hollywood station)
Proportion of ridership of each fare type among machine users
For each type fare equipment projected usage counts, including daily,
AM peak and PM peak.
Given these data inputs, each station spreadsheet then automatically calculates
several intermediate variables that will be used to determine final maximum wait
time statistics for each type of fare equipment:
Equipment composite peak hour transaction time by station
Adjusted peak hour ridership by station – Based on ridership multiplied by
the adjusted ridership growth
Total peak hour equipment users by station – Based on the adjusted peak
hour ridership
Average passenger processing time for each alternative numbers of
machines (ex. Process time for the option of 1 to 25 TVMs are available)
Given these data inputs and intermediate variables, each station spreadsheet
then automatically calculates the final maximum wait time for each type of fare
equipment based on the number of each equipment type available.
If the calculated number of TVMs is less than two per array (at separate
entrances), two TVMs and two SAVs shall be used. At station platforms with
more than one entrance, a single TVM and a single SAV may be placed at each
entrance. Exceptions to the minimum requirement shall be made only after
review of the individual station’s layout (with consideration for safety of
passengers who may cross the vehicle path to reach alternate ticket vending
machines or locations), the fare processing rate of each machine, and the
reliability of the procured fare collection equipment,
C. Parameters and Overall Methodology – Fare Gates
All station designs considered for implementation of fare gating shall have
queuing analysis/modeling and exit calculations performed to determine
feasibility in station design. Where not feasible, station designs shall utilize
Seitenansicht 21