METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-50 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
Where a crossing is in advance of a station such that a minimum time cannot be given (after
departure from the station), the crossing gates shall remain inactivated. If the operator does
not stop, the gates shall be activated and the signal system shall impose a speed reduction
or STOP code to ensure the train cannot enter the crossing before the entrance gates are
lowered. The design shall provide a system for automatic gate activation prior to train
departure. TWC shall be provided to cancel crossing activation and to reactivate the
crossing.
The warning devices shall remain active until the crossing is cleared totally. These grade
crossing systems shall be designed and installed in accordance with applicable
Governmental Rules and, the recommendations of the AREMA and Manual of Uniform
Traffic Control Devices (MUTCD).
Where a 4-quadrant full-closure gate arrangement is required, the design shall arrange for
the leading and trailing gates to operate as specified in CPUC GO 75. The design shall
extend the approach time to take account of the delay in dropping all gates. All gates shall
be individually monitored.
Crossing bell shall be an electronic type, conforming with AREMA Signal Manual, Part
3.2.61. The bell sound level shall be set to 77 dBa ±2 dBa at 10 feet in accordance with
AREMA Signal Manual, Part 3.2.61, unless ambient noise levels dictate otherwise. Where
an electronic processor is used for the crossing equipment, the design shall be such that the
end user may elect, by means of external wiring alteration and without logic redesign, to
silence the bells once all gates are horizontal. Such design shall prevent the bells from re-
activating as the gates rise.
Provide an 8-inch amber LED Motorman's Signal for each track, located on the normal
approach side of the crossing and facing trains approaching in the normal direction of traffic.
Each Motorman's Signal shall display a solid aspect when the crossing approach is
occupied and a flashing aspect when the gates are down and there is no detected
malfunction of the crossing system
9.4.2.12 Track Switches
All track switches shall be powered and interlocked. They shall normally be set and locked
automatically. All route-setting functions shall apply. An over-switch (OS) track circuit shall
be provided, occupation of which shall prevent powered movement of the switch.
A manual switch setting facility shall be provided at powered switch locations. The placing of
a powered switch into manual operation shall result in loss of indication. Signals shall revert
to their most restrictive aspect in the event of loss of indication of switch position.
Switch and lock mechanisms shall meet or exceed the recommendations of the AREMA
Manual of Recommended Practices–Signals. The electrical, electromechanical or
mechanical locking equipment shall prevent switch point movement when the switch points
are in full normal or full reverse position. Three-phase operated switch machines shall be
avoided unless exceptional site conditions (e.g. distance from control point) dictate use of
same.
Parts of switch operating layouts shall be interchangeable between similar layouts.